TAWKE/UBD CELLAR OF CRETACEOUS SITE

7/7/2018

Location: Duhok province 
The scope of work: 
Drilling (6) holes of (Ø 40") diameter and depth ranges from (11 M - 35 M -40 M), then welding and installing (Ø13" - Ø 20" - Ø 30" ) steel conductor pipe, then fill the gap around the pipes with good quality of concrete.
 
 


Get the Flash Player to see this player.
Since entering the replica watches ring, with the watch more and replica watches online more knowledge, more and swiss replica watches more deep understanding of the rolex replica is also more and more favorite.