Harthm Offshore (U. M. M) General Contracting / contribution
An overview of the founding of the company:
Harthm Offshore Company (Lebanese origin company) and has several branches outside Lebanon, where the company's headquarters in Beirut was the opening of a branch of the company in the (Kurdistan / Erbil province) in the year (2007)
The company has developed from the beginning to actively contribute to the implementation of an ambitious plan and the development of infrastructure projects (Kurdistan region) and from within these contributions as follows:
A. Preparation of studies for the project dry Tower
B. Preparation of studies for a project of villas at the foot of Mount Sven
C. Preparation of studies for retaining walls for the project Coughlan Tower
D. Preparation of studies for the project villas in Crane Land
E. Preparation of studies to reduce the depths of the pillars in the Office Tower project in the Empire
2. to provide alternative solutions to reduce the cost of some projects.
3. to provide logistical support for projects drilling of oil wells in the region through drilling (Conductor wells)
4. import special drilling equipment to drill pillars in different soil conditions of the region.
5. Contribute to the completion of the pillars of the foundations of industrial projects and bridges projects and the task of housing projects in the province.
Engineering imperatives to use the pillars in the projects:
That all large engineering-sized enterprises (such as multiple residential towers floors, bridges and facilities ports and industrial laboratories and plants, cement plants and water stations, sewage and walls chock ferrous and towers of power transmission filter) need to implement a specific type of pillars, each according to his condition because of the high vertical loads and side exerts installations on the grounds, which does not allow the use of traditional foundations and must in these cases the use of these pillars of the installations in addition to the seriousness of the determinants seismic regions in the province, which must implement the substrates for these installations.
Specialized equipment and expertise to the company:
The company has specialized equipment and excavators to dig the pillars of the European and Italian origins and making newly manufactured Bmodellat numbers (4) types of excavators (Maicat 180, Maicat 230) and the company's multiple disciplines including:
1. The implementation of the pillars of the type (Bored Piles) and Boqtarmokhtlfah (50cm, 60cm, 80cm, 100cm, 120cm, 150cm) with the implementation of other different types of Alrkaúzulkafah installations.
2. designs and alternative designs for the work of the pillars and walls chock projects.
3. Implementation of the pillars Alonkerat Wallpaper chock.
4. Implementation of the pillars of the type (Micro piles) for certain types of installations and small diameters.
5. Feasibility studies for the implementation of projects pillars and alternative species.
6. conduct tests for loading substrates with providing analytical study with recommendations on the results of tests and according to international standards (ASTM Standard, BS)
7. The company's equipment tests for the purpose of conducting substrates loading tests of large substrates Among the most important of these tests:
A. A static loading tests of substrates (Static compressive loading tests) and in two ways: (Dead loading system) for large loads and up (2500Ton)
(Anchor loading system) for small loads and up (1200Ton)
B. Conduct tests for tensile substrates (Axial tensile loading tests)
C. Conduct tests for side loading substrates (Lateral loading tests)
D. A dynamic load tests for the substrates (Dynamic loading tests)
E. Conduct safety tests (Antkirca) substrates (Integrity testing for piles)
The company's methods in the implementation of the pillars:
The company chose the optimum and economic system for the implementation of the pillars in the Kurdistan region through the selection of the pillars of the drilling system (Bored Piles) were imported modern drilling equipment manufactured substrates such as:
A. Rig (Maicat 230) has the ability to dig very deep and pillars (60 M)
B. Rig (Maicat 180) has the ability to dig very deep and pillars (40 M)
Where it has the ability to dig deep pillars and design required, and that the company imported equipment and special accessories for drilling in conformity with all types of soils of the region and the most important of these facilities:
1. Baktat own digging in hard clay soils (Bucket with clay teeth)
2. Bakat own drilling in the few fish rock layers (Bucket with rock teeth)
3. especially for drilling in rock layers thick using harsh and equipment (Core Barrel)
4. Use Alokrat own digging in hard clay layers. (Clay auger)
5. Use striking Hodeidah (Steel Casing) in case there are problems in destroying the soil during drilling pillars.
The most important projects implemented by the company's projects:
During the past eight years, the company has implemented the type of substrates (Bored Piles) in large numbers and different diameters (60CM, 80CM, 1M, 1.2M, 1.5M) in several large and important projects in the governorates and the Kurdistan region as follows:
Erbil projects:
· Project Trade Center towers in Sheikh God
· Office Tower project in the Empire
· Project Coughlan Tower towers (Phase I and Phase II)
· Project substrates for retaining walls in Crane Land Complex
· Project Sheraton Hotel
· Reconstruction project / development center of Arbil
Sulaimaniyah province projects:
· Project iron and steel plant in Bazian
· Towers project dry Tower
· Residential condominium project Carden City
· German Village project phase substrates (3)
· Intersection Srzinar Bridge Project
· SETTEC Bridge Project
· Revel Bridge Project
· Jq Jq Bridge Project
Dohuk governorate projects:
· Substrates Duhok Stadium
Baghdad governorate projects:
· Substrates Rotana Baghdad hotel
· Electrical substrates Hamedia station
· Substrates Princess Tower in the Mansour
· Loading tests of the pillars in the following projects:
A. Load tests pillars in the sports stadium Altajiat
B. Load tests pillars in the sports stadium Zora
C. Load tests pillars Kennedy Mall project
D. Load tests pillars in Muthanna airport
E. Load tests pillars in Bob al-Sham project
Basra province projects:
· Substrates Sports City
Diyala province projects:
· Dig and pour the wall of the dam project deaf Lalonde in Khanaqin
· Implementation of the pillars of a bridge in Khanaqin Lalonde
Kirkuk province projects:
· Drilling project poured wall plug deaf Hjoh Wall
· Rahim Awa Bridge Project
Implementation of drilling oil wells projects (Conductor Wells):
Oil projects:
· Drilling of oil wells in the Kara Dag area in Sulaymaniyah
· Drilling of oil wells in the area in Sulaimaniyah Sankao
· Drilling of oil wells in the area in Sulaimaniyah Kordmir
· Drilling of oil wells in the area, Mustafa Fakih in Sulaymaniyah
· Drilling of oil wells in the Bazian area in Sulaymaniyah
· Drilling of oil wells in the mountain area and Sven Merawa area in Sulaymaniyah
· Drilling of oil wells in the push sprayed in Dohuk area
· Drilling of oil wells in the area built Jiabao in Arbil
· Drilling of oil wells in the area Pervez Khan in Khanqaan
· Drilling of oil wells in Qadir Karam area in Sulaymaniyah
· Drilling of oil wells in the beer micron area in Sulaymaniyah
· Drilling of oil wells in the area in the Dinara Shirin prominent in Arbil
· Drilling of oil wells in the area of Baba Giesecke silk in Arbil
· Drilling of oil wells in the area in Jnarta Rania in Sulaimaniya
· Drilling of oil wells in the area in the lack of Jean Sinkao in Sulaymaniyah
· Drilling of oil wells in the area numb in Rania in Sulaimaniya
· Drilling of oil wells in Tuz Khurmatu area in Kirkuk
Adopted in the implementation criteria:
The company has adopted global standards and specifications in the implementation of the pillars in all its projects and is therefore as follows:
1. Adoption of the American specifications (ASTM) and (ACI-code) and British Standards (BS8004) in determining the design specifications for the construction side of the pillars of the required loads.
2. Design diameters and depths required for substrates under the above specifications and codes.
3. Provide technical advice to employers in modifying designs that require it.
4. hold the required engineering tests of the pillars of the investigation of the required loads.
5. Implementation of the pillars required Bahacolah and according to the required specifications.
6. conduct business quality control (Quality Control) comprehensive networks of reinforcing concrete poured in the pillars.